Blog

Invitation to Bid for SoCal First Street Bridge Replacement

by

 

DATE:              March 3, 2011                                                   TO:     UDBE / DBE Subcontractors          

SUBJECT:         First Street Bridge Kamagra jelly Replacement 06-1723C

BID DATE:        March 17, 2011 10:00 AM

                       

                                                              INVITATION TO BID

 

C. C. Myers, Inc. is bidding on the above referenced City of Santa Ana project.   This is a highway project with the typical items of work associated.  The work involved includes but is not limited to:

Pavement Markers, Construction Staking, Construction Area Signs, Traffic Control Systems, Reset, Adjust Roadway Items, Plane Asphalt Concrete, Remove Bridge Item, Clearing & Grubbing, Dust Palliative, Roadway Excavation, Grading, Structure Excavation, Structure Backfill, Highway Planting, Erosion Control, Irrigation System, Asphalt Concrete, Pavement Reinforcing Fabric, Furnish & Drive Piling, Pre-Stressing Concrete Cast-in-Place, Minor Concrete Structure, Furnish Pre-Cast Concrete Deck Unit, Erect Pre-Cast Concrete, Concrete Block & Masonry Retaining Wall, Reinforcing Steel, Pipe Lining (Cement Mortar), Roadsign Sign, Lumber & Timber, Welded Steel Pipe, Concrete Curb & Sidewalk-Misc, Misc Iron & Steel Frame – Cover & Grate, Fencing, Thermoplastic Traffic Stripe & Marking, Painted Traffic Stripe & Marking, Pavement Marking, Flat Bed Trucking, Trucker, Construction Equipment Rental, & Demolition.

C.C. Myers, Inc. is willing to breakout any portion of work to encourage UDBE/ DBE participation.   If you are interested in any of this work, please contact us immediately.  Plans and specifications can be ordered from The City of Santa Ana or viewed in our Southern California office.

Conditions or exceptions in Subcontractor’s quote are expressly rejected unless expressly accepted in writing.  CCM requires Subcontractor and Supplier quotes 24 hours prior to the bid date to enable thorough evaluation. Contact CCM for assistance with obtaining bonds, insurance, lines of credit, equipment, supplies or project plans and specifications.

Each Subcontractor shall be prepared to submit faithful performance and payment bonds equal to 100% of their quotation.  The Contractor will pay standard industry rates for these bonds.

AN EQUAL OPPORTUNITY EMPLOYER

Please complete the following information and fax to: 714-978-1156

Company Name__________________________ Contact_______________________

Phone #_______________________

Bidding:   ________ Yes            _________ No

If yes, please provide scope letter/quote as soon as possible.

To view/download this bid opportunity in a pdf format please click here SoCal_First_Street_Bid

Be Sociable, Share!

Tags:

Comments are closed.